Tell me about the key points that should be paid attention to in the engineering container assembly project.

2022-12-05


Tell me about the key points that should be paid attention to in the engineering container assembly project. When it is sunny, turn on the rainproof cloth to dry, evaporate the moisture of the rainproof cloth, and avoid water droplets caused by water vapor dripping on the inorganic vitality heat insulation material, resulting in hard bottom.

Tell me about the key points that should be paid attention to in the engineering container assembly project.

1. Storage in the room: If there are conditions on the construction site, and now there are not many thermal insulation materials, the thermal insulation materials can be stored in the room. In order to avoid the harm to materials caused by the increase of air relative humidity generated by precipitation climate, the dialog box in the room should be used to plug the leakage and avoid rain. The materials are piled up at a distance of 30cm from the ground and covered with rainproof cloth to avoid water stored on the roof and leakage to the storage materials due to precipitation and climate, resulting in hardening of the modified materials and heat insulation materials.

2. Outdoor storage of engineering containers: local sedimentary materials with strong landform are selected, and the surrounding drainage pipes are smooth, which is not easy to store water, and the distance from the ground is about 30cm. Before deposition, a layer of rainproof cloth shall be paved on the table for waterproofing. After deposition, cover it with detailed rainproof cloth, tie it with a rope, and clamp the rainproof cloth tightly with hanging objects. Pay attention to climate change, and when it is sunny, turn on the rainproof cloth to dry, evaporate the moisture of the rainproof cloth, and avoid water droplets caused by water vapor dripping on inorganic vitality heat insulation materials, resulting in hard bottom.

dT8uk_FfSfWjTblNAB4_gA.jpg

Pay attention to matters of construction equipment:

The construction of the engineering container heat insulation system mainly selects the engineering construction hanging basket. When it rains, discourage the engineering construction, disconnect the switching power supply of the construction hanging basket, cover the motor, and avoid short circuit fault caused by water seepage in rainy days, thus causing risks. After the rain starts, the person in charge shall be sent to inquire about the construction hanging basket to avoid showing the problems and risks of the construction hanging basket.

Engineering container insulation construction matters needing attention:

1. Pay close attention to weather forecast, advance warning information, and scientifically arrange engineering construction all the time.

2. Windy weather: In case of strong winds above level 5, high-altitude operations are not to be carried out.

3. Discourage construction in rainy days. According to the day's detailed climate conditions, scientific arrangement of construction procedures. For example, it is avoided to show that the overall surface layer of safety protection has just been completed and its compressive strength is not good. After being washed by water, the phenomenon of surface flatness and plastering thickness not passing the standard and repair will be shown, which is time-consuming and material-consuming.

Attention to engineering container equipment

1. Strengthen the professional training of all workers on the construction site, especially the places that are easy to be ignored in details, so that the construction of the project can be pushed into the hearts of every worker.

2. Inquiries must be timely. Carry out habitual inquiries on the main body of construction behavior of engineering container houses, steel pipe scaffolding, electric hanging baskets, and construction electricity. The main problems found all the time shall be removed immediately, and the damaged parts shall be repaired immediately, and the problems shall be handled in the embryonic stage. In order to ensure the smooth construction of the project, to make high-quality projects. It is expected that all construction units will take preventive measures and scientifically arrange the construction of engineering container projects to avoid material waste.