Steps of Engineering Container Assembly
2022-12-15
Steps of Engineering Container Assembly
It can also be applied to enterprise offices, dormitories, warehouses, storefronts, toilets, mechanical equipment computer rooms and all kinds of temporary commercial land and circulating commercial land in the manufacturing industries such as engineering construction, high-speed rail lines, pavement, water conservancy engineering, petroleum, tourism and vacation.
The process and method of engineering container assembly are as follows:
1. The basic axis standard of each wall is now the requirements of accurate measurement engineering drawings and the standard deviation of axis is plus or minus 25mm, and the basic width-to-height ratio deviation of accurate measurement wall is plus or minus 11mm.
2. The raw materials of engineering containers shall be handled in the field first, and the raw materials shall be reasonably transported to the construction addresses of each project. Care shall be taken during transportation to avoid damage to the raw materials. The steel frame structure size, weld quality to carry out safety inspection after the construction.
3. According to the size of the drawing, first bury the car chassis iron and fix it with expansion screws and basic fixing.
4, steel frame structure assembly, use screws to install rectangular column and steel column, assembly screws as far as possible all tighten, steel column vertical, coplanar, installation parts specifications and models meet all regulations.
5. For the installed steel frame structure, first take up the steel column, the steel column holds the rectangular square pipe column, use the steel column support point structure to reinforce, use the steel column support point structure to be perpendicular to the ground, use the tape measure to measure the standard model, then take up the second frame, assemble the sheet beam and fix it with screws. Other load-bearing walls and sheet beams can be assembled immediately according to the above steps, and the position of steel columns should be checked again for deviation, which needs to be adjusted.

6. After the accuracy is established, the horizontal support and the piercing frame in the steel column are welded with angle iron, and then the square steel pipe column and the chassis iron are arc welded.
7. After the column and beam are installed, assemble the floor slab. The floor slab shall be compactness in the middle of the floor slab.
8, floor slab shop after the beginning of the assembly of the wall, the assembly of the wall, embedded parts of the window parts, when the wall is fully installed, the beginning of the assembly of cast-in-place floor, sealing eaves, waterproof, roof cover, etc.
9. Assemble the windows after the house is installed as a whole. Pay attention to the compactness of the windows. There should be no gap with the retaining wall. Waterproof treatment should be carried out after the windows are assembled. The installation of the doors should be flat and straight, and look clean and tidy.
10. For the protective fence of the floor slab assembled by the engineering container, it is required that the protective fence is vertically connected with the protective fence column firmly. The ladder step is made of stainless steel checkered plate or angle iron. The floor slab should not shake. The leaping staircase and the umbrella wall are fixed unchanged. The corrugated guardrail plate is fixed with 75MM self-drilling self-tapping screws and the leaping staircase.
11. Pouring high-rise epoxy floor paint, installing cables, and piecing together PVC aluminum gusset ceiling.
Yangzhou Maotai Logistics Equipment Co., Ltd
Address:178 Wuzhou East Road, Yangzhou Economic Development Zone, Jiangsu Province
E-mail:baosonglai@vip.163.com
Scan QR Code
Copyright: Yangzhou Maotai Logistics Equipment Co., Ltd