Installation and precautions of office containers

2023-08-24


Container mobile homes are similar to building buildings. Level the perimeter and foundation of the partition wall. With reinforced concrete is better, more strong. Then the column, connect the frame with the beam, and put on the partition, exterior wall panel, door and window frame; then lay the floor, install another layer, then the roof frame and roof panel; then install doors and windows, etc., and pull the vertical support. There are sanitary ware, hardware and the like.

Container mobile homes are similar to building buildings. Level the perimeter and foundation of the partition wall. With reinforced concrete is better, more strong. Then the column, connect the frame with the beam, and put on the partition, exterior wall panel, door and window frame; then lay the floor, install another layer, then the roof frame and roof panel; then install doors and windows, etc., and pull the vertical support. There are sanitary ware, hardware and the like.

  1.Office ContainerConstruction process

Setting of foundation ditch-excavation-C15 concrete foundation ground beam and ground concrete cushion construction-ground beam installation-column installation-floor in-line beam system installation-walkway system installation-exterior wall panel installation-window installation-door installation-canopy system installation-roof system installation-inner partition installation-PVC suspended ceiling-clean site-completion acceptance

  2.Office ContainerConstruction Requirements

1. Gray line lofting: measure according to the position of the living area plan.

  1)Office ContainerResidential Container Components

The installation position of each component shall meet the design requirements, and the on-site welding position shall be accurate, without false welding and welding leakage.

2) Fasteners

A kind of fastener should meet the requirements of GB5782

The bay bolts should be installed in the correct position and filled with washers according to the design requirements, and must not be installed or not installed.

The connecting bolts between the components should be tightened.

3) Paint

During on-site welding and transportation, one layer of antirust paint shall be painted again at the place where the primer falls off. Two layers of topcoat shall be painted at the exposed part of the components. The paint shall be free of leakage, peeling, hanging and rust return.

4) Wall

 Office ContainerAnd a wall of walls should be corrected.Office ContainerThe corners and outer corners of the umbrella wall are sealed with angle aluminum. I-shaped aluminum is used for plate-to-plate connection. Each wall should be vertical and embedded. The seam depth should be consistent, neat and clean, the wall surface should be clean, the color should be consistent, the plate seam should be neat, the nail surface should be consistent up and down, there should be no dislocation, the necessary parts should be self-tapping bolts.

Wan marks the positions of the doors and windows of the container conference room according to the design drawings, cuts out the positions of the door and window holes with a cutting machine, and installs the doors and windows according to the positions of the door and window holes. The windows are plastic-steel windows, and the ceiling bottom of the Beijing container mobile room is rented.

5) Doors and windows

Install doors and windows correctly and tighten with bolts.

Bay doors and windows should be installed flexible, not blocked. There shall be no pitting or crack on the glass surface. The glass should be clean and the accessories should be installed firmly.

6) Floor

Floors should be laid in gray, and there should be no cracks between floors for installation. The surface of cement or fine aggregate concrete shall be compacted and polished without defects such as cracks, spalling and sanding.

7) Gutter

Gutter joints shall be firmly connected and the joints shall be coated with waterproof glue. There shall be no water accumulation and water leakage in the gutter. The downpipes shall be installed vertically and firmly, and the hoop distance shall be 1300.

  3.Office ContainerAppearance requirements

  1)Office ContainerThe wall surface should be vertical, even, neat and clean.

  2)Office ContainerThe walls should be clean, the colors should be consistent, and the seams should be neat.

  3)Office ContainerDoor and window lock switches are flexible and require accessories.

 

Yangzhou Maotai Logistics Equipment Co., Ltd

Address:178 Wuzhou East Road, Yangzhou Economic Development Zone, Jiangsu Province

Scan QR Code

Scan QR Code


Copyright: Yangzhou Maotai Logistics Equipment Co., Ltd